Updated: 

Iowa Lead Times

Product Line Casements, Awns, Pictures Single - Double Hungs Direct Sets (including 3.25 Pinnacle) Radius Patio Doors In & Outswing, Sliders Patio Doors Multi-slides, Bi-folds Sliding Windows Corner Windows
Legend 5-6 5-6 5-6 5-6 n/a n/a n/a n/a
Next Dimension Classic n/a 3-4 3-4 3-4 3-4 n/a 3-4 n/a
Next Dimension Pro n/a 3-4 3-4 3-4 3-4 n/a 3-4 n/a
Next Dimension Revive 3-4 3-4 n/a n/a n/a n/a n/a n/a
Next Dimension Signature 3-4 n/a 3-4 3-4 3-4 n/a n/a n/a
Pinnacle 4-5 4-5 4-5 4-5 4-5* 7-8 4-5 4-5
Pinnacle (3 1/4" frame) 5-6 n/a 4-5 n/a n/a n/a n/a n/a
Pinnacle Entry Doors n/a n/a n/a n/a 8-9 n/a n/a n/a
Pinnacle Hybrid 5-6 5-6 5-6 5-6 5-6 n/a n/a n/a
Pinnacle Prime 5-6 5-6 5-6 5-6 5-6 n/a 5-6 n/a
Pinnacle Select 4-5 6-7 n/a n/a 10-11 10-11 6-7 n/a
Pinnacle Select (Impact) 4-5 n/a n/a n/a n/a n/a n/a n/a
Revive 5-6 5-6 n/a n/a n/a n/a n/a n/a
Sash Packs-Clad n/a 4-5 n/a n/a n/a n/a n/a n/a
Sash Packs-Legend n/a 5-6 n/a n/a n/a n/a n/a n/a

* Patio door screens that are white, black, bronze, clay, tan, sable and champagne have a 5 week lead time. Door screens in any other color have a 6 week lead time.

Option Lead Times Iowa

Option Additional Lead Time
Custom Clad Colors Per CPR
Painted Vinyl + 1 week
Stained Interior +1 week

Parts Lead Times Iowa

Parts Lead Time
Frame only 3 weeks
Glass only 2 weeks*
Manufactured parts 3 weeks
Non-stocked parts 3 weeks
Sash only 3 weeks
Stocked parts 1 week
Wood lineal (no prep) 1 week

* Laminated glass and glass that is over 17 square feet will require a 3 week lead time

Weekly Iowa Lead Times Notes:

  1. Orders will be acknowledged with the longest lead time product. Lead times are based on your weekly order date.
  2. Published lead times are an estimated date of when manufactured product will ship and does not include transit time.
  3. Add 1 week to posted lead times for shipping.
  4. Larger orders with specific values based on product material will be reviewed and may receive longer lead times: Wood at $75,000 + NET and Vinyl at $50,000 + NET.
  5. Holidays may have an impact on published lead times.
  6. Lead times are subject to change. Lead times will be updated weekly or as needed.